Who Takes It : Personnel who use the equipment.
Class Length
- Vehicle: Mounted Elevating and Rotating Aerial Devices (e.g. truck mounted boom): 3 hours
- Manually Propelled Elevating Aerial Platforms (e.g. manlift): 2 hours
- Boom: Supported Elevating Work Platforms (e.g. straight reach or articulating boom lift): 3 hours
- Self-Propelled Elevating Work Platforms (e.g. scissor lift): 2 hours
Topics
- Pre-use inspection
- Operating rules; safe operation and maintenance
- Load and capacity ratings
- Clear operating area
- Traveling/maneuvering
- Fall protection




